PWA Bangpakhong_ Repairing and Improvement cathodic protection system project at Wat Khao Sa-at Pump station. (Impressed Current)
Description
Impressed Current installation. The cathodic protection current was determined by assuming 2% coating breakdown of the pipelines (Diameter 800mm) 16.800 km for 40 years protection. The conservative calculations showed that in order to meet the CP current a total of 3 MMO anodes 18 test stations and 1 Transformer Rectifier will be needed. In the installation, the MMO anode, test stations and Transformer Rectifier must be installed as follow the design report.
Details
- Owner: Provincial Waterworks Authority Bangpakhong
- Contractor: CGL ENGINEERING CO.,LTD.
- Location: Wat Khao Sa-at Pump station, Bang Bo , Samut Prakan Thailand.
Project skills
- Installation complete