PTT NGD_INSTALL PCRH 3.5 KA

Details

  • Owner: PTT NATURAL GAS DISTRIBUTION CO., LTD.
  • Contractor: CGL ENGINEERING CO., LTD.
  • Location: PTT NGD GAS STATION (RANGSIT)
  • Working Period: 7 days
Project skills
  • Installation complete
    100%
  • Measurement complete
    100%
Project link