PTT3 NATURAL GAS PIPELINE CIP & DCVG SURVEY RC 460 (89 km.)
Details
- Owner: PTT NATURAL GAS DISTRIBUTION CO., LTD.
- Contractor: CGL ENGINEERING CO., LTD.
- Location: RC 460
- Scope of works: CIP Survey, DCVG Survey
- Working Period: 150 days
Project skills
- DCVG Survey
- CIP Survey
- Presentation