PTT3 NATURAL GAS PIPELINE CIP & DCVG SURVEY RC 460 (89 km.)

Details

  • Owner: PTT NATURAL GAS DISTRIBUTION CO., LTD.
  • Contractor: CGL ENGINEERING CO., LTD.
  • Location: RC 460
  • Scope of works: CIP Survey, DCVG Survey
  • Working Period: 150 days
Project skills
  • DCVG Survey
    100%
  • CIP Survey
    100%
  • Presentation
    100%
Project link