IRPC_COATING DEFECT SURVEY LINE 12" - GOKE-6969215001 - A28 FROM IRPC TO PTTGC (23KM.)

Description

This Project has been developed to ensure that all persons working on the Cathodic protection for DVCG survey pipeline of IRPC TO PTTGC (23 km) is complied with OWNER’s requirement and legal requirements. The results of DCVG survey were found 4 defect point at KP.9+479, KP.18+457, KP.21+159 and KP.22+493.

Details

  • Owner: IRPC PUBLIC CO., LTD.
  • Contractor: CGL ENGINEERING CO., LTD.
  • Location: PIPELINE IRPC TO PTTGC
  • Scope of works: DCVG Survey 23 Km.
  • Working Period: 60 days
Project skills
  • DCVG Survey
    100%
  • Presentation
    100%
Project link