PTT2_CIP and DCVG SURVEY 2017 RC 673 GULF

Description

This Project has been developed to ensure that all persons working on the Cathodic protection for CIP and DVCG survey pipeline of RC 673 GULF (1.5 km) is complied with OWNER’s requirement and legal requirements. The results of DCVG survey were not found defect point.

Details

  • Owner: PTT PUBLIC CO., LTD.
  • Contractor: CGL ENGINEERING CO., LTD.
  • Location: RC673 – GULF
  • Scope of works: CIP Survey, DCVG Survey
  • Working Period: 14 Days