EGAT_YEARLY PREVENTIVE MAINTENANCE PIPELINE JETTY OF KRABI THERMAL POWER PLANT

Description

Measurement the Impressed Current system for the Krabi electric fuel pipeline, with the following details: 1. Measure the Rectifier 4 cabinet 2. Measure the pipe to soil 17 Test stations. The summary of the results from the Pipe to Soil Potential measurement of Pipe to Soil Potential, it can be seen that there is a value greater than the standard at –850mV for every test stations. Indicates that the Cathodic protection system is still working normally according to the NACE Standards.

Details

  • Owner: ELECTRICITY GENERATING AUTHORITY OF THAILAND
  • Contractor: CGL ENGINEERING CO., LTD.
  • Location: THERMAL POWER PLANT (KRABI)
  • Working Period: 14 days
Project skills
  • Maintenance complete
    100%
  • Presentation
    100%