FPT_BANGKOK – NAKHONRATCHASIMA HIGH SPEED RAILWAY DCVG PROJECT

Description

This Projct has been developed to ensure that all persons working on the Cathodic protection for DVCG survey FPT pipeline 272 meter (KP. 13+742 – 14+014) is complied with OWNER’s requirement and legal requirements.

Details

  • Owner: GEO-ENGINEERING INVESTIGATION INSTITUTE OF JISNGSU PROVINCE
  • Contractor: FUEL PIPELINE TRANSPORTATION LIMITED
  • Sub Contractor: CGL ENGINEERING CO., LTD.
  • Location: FPT PIPELINE KP. 13+742 – 14+014
  • Working Period: 3 Days
Project skills
  • DCVG SURVEY
    100%
  • Presentation
    100%
Project link