THAPPLINE_INSTALL AC MITIGATION SYSTEM AND TEST STATION WITH SOLID-STATE DECOUPLER (BUDGET 2017) IN THE AREA OF PIPELINES PIPERACK, MAP TA PHUT - SI RACHA, SI RACHA - LAM LUK KA, LAM LUK KA - SUVARNABHUMI.

INSTALL AC MITIGATION SYSTEMS

Installing the Zinc Ribbon Anode along the pipeline by embedding the Zinc Ribbon one meter deep and aligning between the power transmission lines and pipelines with both filling and grinding by sand 0.5 meters. And placing PVC Warming Strip size 200 millimeter throughout the excavation. The connection between the pipeline and the zinc ribbon must be connected in the test station with the Soil-State Decoupler device of 2.0 kA and every test stations must be installed with zinc ground mats. In case of having to connect from the pipeline to test station, use Pin Brazing method only, with the following details:

Pipeline (Map Ta Phut – Sri racha)

Total area of 22 points, install zinc ribbon 17.66 kilometers and 58 test stations with soil-state decoupler device of 2.0 kA and zinc ground mats.

Pipeline (PIPERACK)

Install 5 test stations with soil-state decoupler device of 2.0 kA

Pipeline 1 (Si Racha – Lam Luk Ka)

Install 5 test stations with soil-state decoupler device of 2.0 kA

Pipeline 4 (Lam Luk Ka – Suvarnabhumi)

Install 2 test stations with soil-state decoupler device of 2.0 kA

CAthodic protection monitoring

Install the AC, DC Interference impact recording device. The device has the following features: Can measure and record electrical parameters at the same time, such as Uac, Edc, Iac, Idc, spread resistance and Corrosion rate. Corrosion rates calculated from electrical resistance (ER) technique.

Install the Cathodic protection monitoring device 2 points at the Block valve 652 and Block valve 653.

Description

Thai Petroleum Pipeline Co., Ltd. (Thappline) intends to hire the AC MITIGATION system installation in the area of pipelines PIPERACK, Map Ta Phut - Si Racha, Si Racha - Lam Luk Ka, Lam Luk Ka – Suvarnabhumi to prevent the damage from the high voltage of power transmission lines. That affects oil pipelines and workers.

Details

  • Owner: Thai Petroleum Pipeline Co., Ltd. (Thappline)
  • Contractor: CGL Engineering Co., Ltd
  • Location: area of pipelines PIPERACK, Map Ta Phut - Si Racha, Si Racha - Lam Luk Ka, Lam Luk Ka – Suvarnabhumi.
  • Working Period: 300 days
Project skills
  • Installation complete
    100%
  • Presentation
    100%
Project link