Details

  • Owner: PTT Public Co., Ltd.
  • Owner: IRPC Public Co., Ltd.
  • Contractor: TRC Construction Public Co., Ltd.
  • Sub Contractor: CGL Engineering Co., Ltd.
  • Working Period: 3 Days