PTTNGD_PTTNGD Lightning system of Good Year Pressure off-take Station
Description
Installation Lightning at Good Year Pressure off-take Station to according to the law and standards of Engineering Council. The contractor must design the lightning rod system according to the standard of Engineering Council. Department of Energy Business (DOEB) requires that lightning protection must be designed to cover the gas station. In the installation of the lightning rod system must install Insulation Flange at the end of the conductor rod. To separate the connection between the lightning rod and the metal pole and install the PVC pipe from the end of the pole to the test box to separate the connection between the power cable and the metal pole with the test box set as the connection point between the lighting posts and Ground Rod.
Details
- Owner: PTT NATURAL GAS DISTRIBUTION CO., LTD.
- Contractor: CGL ENGINEERING CO., LTD.
- Location: Good Year Pressure Regulating Station (Rangsit)
- Working Period: 30 days
Project skills
- Installation complete
- Presentation