THAI OIL_DCVG OF HOT TAP, ESSO’S ROAD AND TOP PIPELINE PROJECT

Description

This Project has been developed to ensure that all persons working on the Cathodic protection for DVCG survey TOP pipeline is complied with OWNER’s requirement and legal requirements. The results of DCVG survey were not found defect point.

Details

  • Owner: THAI OIL PUBLIC CO., LTD.
  • Contractor: SRIRACHA CONSTRUCTION PUBLIC CO., LTD.
  • Sub Contractor: CGL ENGINEERING CO., LTD.
  • Location: TOP pipeline
  • Working Period: 5 Days
Project skills
  • DCVG Survey
    100%
  • Presentation
    100%
Project link