THAI OIL_HOT TAP, ESSO’S ROAD AND TOP PIPELINE PROJECT
Description
Installation Cathodic Protection System, Inspection Insulation Flange and Pipe to soil potential Test.
Details
- Owner: THAI OIL PUBLIC CO., LTD.
- Contractor: SRIRACHA CONSTRUCTION PUBLIC CO., LTD.
- Sub Contractor: CGL ENGINEERING CO., LTD.
- Location: TOP pipeline
- Working Period: 15 Days
Project skills
- Installation complete
- Measurement complete
- Presentation