THAI OIL_HOT TAP, ESSO’S ROAD AND TOP PIPELINE PROJECT

Description

Installation Cathodic Protection System, Inspection Insulation Flange and Pipe to soil potential Test.

Details

  • Owner: THAI OIL PUBLIC CO., LTD.
  • Contractor: SRIRACHA CONSTRUCTION PUBLIC CO., LTD.
  • Sub Contractor: CGL ENGINEERING CO., LTD.
  • Location: TOP pipeline
  • Working Period: 15 Days
Project skills
  • Installation complete
    100%
  • Measurement complete
    100%
  • Presentation
    100%