THAPPLINE_DCVG SURVEY THAPPLINE 2 PIPELINE 2017

Description

This Projct has been developed to ensure that all persons working on the Cathodic protection for DVCG survey to OIL Pipeline Thappline at 88 km is complied with OWNER’s requirement and legal requirements.

Details

  • Owner: Thai Petroleum Pipeline Co., Ltd. (Thappline)
  • Contractor: CGL Engineering Co., Ltd.
  • Location: PIPELINE 2 (Lum Luk Ka - Suvarnabhumi)
  • Working Period: 150 Days
Project skills
  • DCVG Survey
    100%
  • Presentation
    100%
Project link